Device Management FOUNDATION Fieldbus
3BDS011222-510 B 293
select the H1 Schedule object (refer to Figure 174). For experienced users, there is
the possibility of moving the individual blocks in the schedule manually.
Check and Save Project
16. After the FF Applications have been created, check the configuration for
plausibility by means of Tools > Check whole project and correct any errors
which occurred.
17. After a successful check for plausibility, store the HSE Subnet by means of FF
Object editor > Save.
18. Exit Fieldbus Builder FF.
Upload HSE Subnet
When the Fieldbus Builder FF is closed, the project is automatically uploaded
to the Plant Explorer Workplace. In the FF Management aspect of the HSE
Subnet object the status of the last upload is displayed by a traffic light. When
the upload failed, the Available Subnet Version and the Uploaded Version are
different.
19. If the upload failed select the FFUpload aspect and check the reason for the
upload failure in the aspect preview area.
Figure 174. Example of a Schedule